670 scheduled environmental inspections in Oct–Dec 2026
ZIKO — Clean Wastewater

Free wastewater analysis

Send us 5 L of wastewater — get a chemist’s report.

State Environmental Inspectorate · 2026 plan

Is your company on the 2026 inspection plan?

Names in the plan are in Ukrainian — part of the name is enough, without “ТОВ” or quotes.

Why

What matters to you right now?

Pick one — we’ll show what the analysis gives you.

An engineer takes a wastewater sample into a 5-litre canister A chemist analyses the sample on a spectrophotometer Trial treatment: jar test to select reagents A chemist prepares the analysis report
How it works

From 5 litres to a report

Trial treatment

Drag the slider

Wastewater before and after reagent selection in the lab.

Order a free analysis

Illustration. Results depend on your wastewater composition.

After trial treatment: clear water with sediment at the bottom
Before treatment: turbid wastewater
ZIKO · LaboratoryChemist’s report
Company
1
ParameterBeforeAfter
2Reagents and doses
3Cost per 1 m³
4Process recommendation
Sample structure. Values depend on your wastewater.
Outcome

What the report includes

  • 1Parameters before and after trial treatment
  • 2Reagents and working doses
  • 3Estimated cost of treating 1 m³
  • 4Process recommendation

You can use the report with regulators as evidence of testing and of work on a treatment process.

The analysis report does not replace mandatory permit documentation and does not guarantee the absence of findings by regulators.

Confidential: your data is never shared with third parties

ZIKO laboratory

Who analyses your wastewater

Olha Rubai
Olha RubaiPhD (Eng.), Head of Environmental Engineering
Leonid Krasnovskyi
Leonid KrasnovskyiLead design engineer
Nadiia Burmus
Nadiia BurmusProcess engineer
What comes next is up to you

The analysis comes with no obligation

  1. Analysis
  2. Trial treatment
  3. Chemist’s report
  4. Feasibility study
  5. Design
  6. Equipment
  7. Installation
  8. Commissioning
  9. Service

“Clean Wastewater” programme

Experience

From the lab to working treatment plants

ZIKO engineer at a company treatment plant
ZIKO engineer on site
Upgraded wastewater treatment plant
Treatment plant upgrade
ZIKO service team
Service across Ukraine
8.2 M+ m³of wastewater treated
200+wastewater solutions
since 1993in water engineering
ZIKO client ZIKO client ZIKO client ZIKO client ZIKO client
FAQ

The essentials

How much does the analysis cost?

It’s free: sample analysis, trial treatment and a chemist’s report.

Does the analysis oblige us to buy equipment?

No. The analysis gives you actual data and tests whether your wastewater can be treated. The next steps are your decision.

Why bother if we have no wastewater problems right now?

That’s exactly why it’s easier to do it now rather than in emergency mode: you’ll know your effluent composition, whether it can be treated and the right process in advance.

Will the report help during a State Environmental Inspectorate check?

The report shows that your company is testing its wastewater and working out a treatment process. It does not replace mandatory permits and does not guarantee an inspection without findings.

What exactly do we get?

A chemist’s report: parameters before and after trial treatment, reagents and doses, an efficiency assessment, the cost of treating 1 m³ and a process recommendation.

Who will see information about our company?

No one except ZIKO specialists. Data about your company, wastewater and test results is never shared with third parties.

How do we hand over the sample?

After you send a request, a ZIKO engineer will contact you to arrange sampling and delivery of 5 litres of wastewater.

Order a free analysis

A ZIKO engineer will contact you to arrange the sample handover.








    +38 095 93 21 273

    We don’t guess — we test.
    We don’t oversell — we select what you need.